Skip to main content

507140 N.W.T. Ltd. (GoldMining Inc.) - MV2011C0021

Ormsby and Nicholas Lake Property, 90 kilometers north of Yellowknife, near the Discovery Mine: winter road from the north end of Prosperous Lake to the Ormsby property and from there to Nicholas Lake; mine portal sites; a camp and airstrip and laydowns. The continued use and access to the existing core storage area located near the former Discovery Town site.
Previously as Permit MV2005C0001. Accompanied by Licence MV2013L2-0001. Renewed into MV2018C0021.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 23 of 23
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
GoldMining Inc - 2018 Geotechnical Inspection of Airstrip - Apr 2_20.pdf (1.43 MB)
Tyhee NWT Corp - 2014 Geotechnical Report to be resubmitted - Jan 21-15.pdf (116.67 KB)
Tyhee NWT Corp - 2014 Geotechnical Report - Staff Report and Comments - Jan 21-15.pdf (244.27 KB)
Tyhee NWT Corp - Request Letter 2014 Airstrip Geotechnical Report - Nov 30-14.pdf (99.92 KB)
Inspection Reports
Document Received/Sent Uploaded
GoldMining Inc - Inspectors Order Closure - INAC - Sep 11-18.pdf (15.09 KB)
GoldMining Inc - Response to Inspection Report for May 31st 2018 - INAC - Jun 11-18.pdf (114.67 KB)
GoldMining Inc - Inspection Report for May 31st 2018 - INAC - Jun 11-18.pdf (1.15 MB)
Tyhee NWT Corp - Inspection Report for June 20 2017 - INAC Inspector - Jun 26-17.pdf (202.31 KB)
Tyhee NWT Corp - Inspection Report for June 3 2016 - INAC Inspector - Jul 20-16.pdf (195.48 KB)
Tyhee NWT Corp - Inspectors Order - Failure to comply - AANDC Inspector - Jul 15-15.pdf (288.46 KB)
Tyhee NWT Corp - May 20th 2015 Inspection Report - AANDC - May 25-15.pdf (1.58 MB)
Tyhee NWT Corp - 2013 Airstrip Geotechnical Report - Nov 30-13.pdf (1.68 MB)
Tyhee NWT Corp - Pictures from September 27 2012 Inspection - AANDC - Oct 2-12.pdf (6.32 MB)
Tyhee NWT Corp - Inspection Report - Oct 1-12.pdf (2.07 MB)
Tyhee NWT Corp - Follow up on Inspector concerns - Jun 8-12.pdf (6.02 MB)
Tyhee NWT Corp - Inspection Report - Jun 4-12.pdf (1.98 MB)
Tyhee NWT Corp - Inspection Report - Mar 14-12.pdf (4.09 MB)
Tyhee NWT Corp - Response on Inspection Report - Mar 14-12.pdf (61.47 KB)
Operations and Notifications
Document Received/Sent Uploaded
GoldMining Inc - Correspondence on Notice of Cleanup and Inspection - May 22-18.pdf (101.71 KB)
GoldMining Inc - Notice of Cleanup and Inspection - May 18-18.pdf (99.05 KB)
Tyhee NWT Corp - Closure of Operations - Staff Report - Aug 13-15.pdf (317.59 KB)
Tyhee NWT Corp - Notice of Camp Shutdown - May 28-15.pdf (36.26 KB)
Other
Document Received/Sent Uploaded
Tyhee NWT Corp - 2012 Airstrip Geotechnical Report - Nov 30-12.pdf (2.07 MB)