Skip to main content

Canadian Zinc Corporation - MV2021L2-0004

​Allied Permit: MV2021D0005

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.


Uploaded On or After
Uploaded On or Before
Displaying 101 - 104 of 104
5. Reports and Studies
SNP Reports
Document Received/Sent Uploaded
CZN - SNP Report May 21 - Jun 19 - Jul21_23.pdf (3.51 MB)
CZN - SNP Report Sep 29 - Dec 31 - Jan20_23.pdf (8.49 MB)
Spill Reports
Document Received/Sent Uploaded
CZN - Spill Report - July 2 2023 - Feb3_25.pdf (453.21 KB)
CZN - Spill Report - September 5, 2024 - Sep5_24.pdf (377.91 KB)