Skip to main content

Town of Hay River - MV2024L7-0010

​Renewal application for installation, operation, and maintenance of marina including boat launch, gabion retaining structure, sheet pile retaining wall; dredging; shoreline remediation to address riverbed erosion; installation and maintenance of a floating dock. Added activities to scope (i.e., deposit of waste, installation of a retaining wall) were already screened with amendment application.


Renewal 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 6 of 6
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
Porritt Landing - Renewal - Engagement Plan V1.1 - Apr15_25.pdf (1.56 MB)
Porritt Landing - Engagement Plan V1.1 - Staff Confirmation of Conformity - Apr25_25.pdf (153.34 KB)
Sediment and Erosion Control
Document Received/Sent Uploaded
Porritt Landing - Erosion and Sediment Control Plan V2.1 - Apr15_25.pdf (2.78 MB)
Porritt Landing - ESCP V2.1 - Staff Confirmation of Conformity - Apr15_25.pdf (154.04 KB)
Waste Management Plan
Document Received/Sent Uploaded
MV2024L7-0010 - WMP V4.1 - Staff Confirmation of Conformity - Apr15_25.pdf (153.72 KB)
Porritt Landing - Waste Management Plan V4.1 - Apr15_25.pdf (1.34 MB)